ASE-7516 Dynamic Planning with Incomplete Information, 5 cr
Lisätiedot
The course will be lectured in every second year.
Suitable for postgraduate studies.
Ei toteuteta lukuvuonna 2016-2017.
Vastuuhenkilö
Risto Ritala
Opetus
Toteutuskerta | Periodi | Vastuuhenkilö | Suoritusvaatimukset |
ASE-7516 2016-01 | - |
Risto Ritala |
Exam and exercise work. |
Osaamistavoitteet
This course expresses the planning problem as discrete-time dynamic programming with both action and information channel degrees of freedom. Problems studied include both discrete state and continuous state systems. Is capable (grade 3/5) 1. To formulate the control of the system and the selection of the information channels as a partially observable Markov decision process (POMDP) problem. 2. To produce approximate solutions to POMDP problems and to assess their suboptimality. 3. To explain the opportunities of approximate dynamic programming with POMDPs when system models are uncertain.
Sisältö
Sisältö | Ydinsisältö | Täydentävä tietämys | Erityistietämys |
1. | Concurrent planning action on system and selection of information channels. | ||
2. | Partially observable Markov decision process (POMDP). | ||
3. | Solving dynamic programming problem for linear-quadratic-Gaussian POMDP. | ||
4. | Solving dynamic programming problem for discrete state POMDP | ||
5. | Dealing with model uncertainties by applying approximated dynamic programming methods. |
Ohjeita opiskelijalle osaamisen tasojen saavuttamiseksi
Exam and exercise work.
Arvosteluasteikko:
Numerical evaluation scale (0-5)
Oppimateriaali
Tyyppi | Nimi | Tekijä | ISBN | URL | Lisätiedot | Tenttimateriaali |
Lecture slides | No |
Esitietovaatimukset
Opintojakso | P/S | Selite |
ASE-4060 Systeemien hallinnan kehittyneet menetelmät | Advisable | |
ASE-4080 Systeemien hallinnan case study | Advisable | |
ASE-7536 Model-Based Estimation | Advisable |
Vastaavuudet
Opintojakso | Vastaa opintojaksoa | Selite |
ASE-7516 Dynamic Planning with Incomplete Information, 5 cr | ASE-7516 Dynamic Planning with Incomplete Information, 5 cr |